hello world.
      it's been a while since i posted a "normal" post (since tapdefense was too nerdy, btw, ver2.0 is out!!)
    things are pretty busy as usual, but with the wedding coming up and renovations+moving, there's a lot to get done before the end of June.  we're hoping to get a large portion of our move done on the May two-four weekend.  most of the infrastructure at walmer is done.  our appliances have arrived and once the shower glass is installed, we just need to get our fireplace/tv area set up for the major stuff.  oh yeah, still need some lights for the bathroom/sconce lighting as well as a dining light and possibly one for the island.
definitely looking forward to a great honeymoon as GL has secured some fantastic super-hotels and our itinerary is looking super-foodie :)
will try and update more often =)
    

0 Comments:
Post a Comment
<< Home